Today, besides the other regions of the Fenghua, Ninghai Xiangshan outside the restoration of electricity

Category: Ningbo News
Published: Thursday, 09 August 2012 11:27

source 2012-8-9 8:58:57 Ningbo Evening News

  8:00 yesterday morning, check work area of Ningbo Electric Power Bureau, maintenance, distribution transport a group of squad leader Lin Weiguo jump on the yellow emergency rescue vehicles, once again starting.
  The destination is the Culture and Education Road, Jiangbei District, Fan Jiang lines were blown down in the evening of the 7th branch pressure off the work area of distribution transport seized for the first time taken by the power cuts, the vast majority of users to restore power, but still There are ten families power failure.
  Begin to run from the night before, which is 59th out of the bus check work area for distribution transport accident repair squad, Lin Weiguo also has a sleepless night. Not only the City to see the shadow of the power supply repair personnel, and other areas in the city, power supply repair at the repair site, is to repair the road.
  Reporter yesterday from Ningbo Electric Power Bureau was informed that the As of 20:00 yesterday, Ningbo grid of six 500-kV line trip, all coincide success; 220-kV line trip 10 times, repair there is still a 220 kV restore the power supply; 110 kV line trip 22 times, there is still a 110 kV line failed to restore power transmission; a total of 533 10-kV line fault power outage has been restored to 444 line-powered, there are 89 were not restored.
  According to reports, the Zhejiang Power Company has arranged for 200 of the Jinhua Power Supply Bureau, Wenzhou Power Supply Bureau 200 repair teams to go to Xiangshan County, Fenghua support the repair work. Fenghua, Ninghai, Xiangshan, Ningbo youngest, Zhenhai, Beilun, Cixi, Yuyao, Yinzhou no later than today to complete all fault repair, restoration of electricity.
  Repair power facilities
  Yesterday morning, the electricity sector in Zhenhai District of Typhoon "sea anemone" damage caused by power facilities, organizational maintenance personnel to carry out emergency repairs. 20 lines have been repaired power, 6 line is repair. In the afternoon, Zhenhai electricity sector has drawn more than 50 support hit the electricity sector in Ninghai repair power facilities. Correspondent Zhang Jing Discovery reporter Zhang Ke