Home
Alibaba Invests in Israel Startup for QR Codes Technology

Chinese online giant Alibaba is investing an unspecified amount of money in Israel-based tech startup called Visualead.
Visualead's technology focuses on developments in Quick Response codes, also known as QR codes.
The Israeli company is has been working with 500-thousand small and medium enterprises to develop QR codes embedded with specific images in them.
The investment comes as Alibaba moves to try to make it easier for users to access to its mobile platforms.
- Details
- Category: Ningbo News
All aboard bullet trains to Ningbo
THE Shanghai-Ningbo high-speed railway opened yesterday, cutting travel time between the two cities from 180 minutes to 100 minutes.
The line, which has a maximum speed limit of 300 kilometers per hour, is essentially an extension of the Shanghai-Hangzhou line that opened about three years ago.
"The new bullet train lines will help balance economic development in the Yangtze River Delta region," said Sun Zhang, a rail expert with Shanghai Tongji University.
Passengers seemed to agree with Sun's assessment, especially businesspeople.
"Speed is the key," said Zhang Hua, a passenger who boarded G7505, the first bullet train from Shanghai to Ningbo yesterday morning. "The higher ticket prices are not a major concern."
Zhang, who works for a clothing company in Shanghai that has business in Ningbo, said the express service is about 80 minutes faster than previous trains.
Other businessmen told Shanghai Daily yesterday that in the past they would travel a day in advance of meetings, but the bullet trains allow them to travel the same day.
A second class ticket costs 150 yuan (US$24.44) while first class costs 250 yuan per person.
- Details
- Category: Ningbo News
All freeway entries closed on February 8
From 00.00 of February 9, the free access of freeways by private cars during the Spring Festival period will be implemented. However, the heavy snow of February 8 brought new problems. Since 6 pm of February 8, all the freeway entries in Ningbo have been closed, along with the southern linking path of Hangzhou Bay Bridge, Zhoushan Bridge and Xiangshan Port Bridge.
In terms of high ways, a lot of mountain roads have become unavailable because of the snow, including the Fenghua section and part of Yuyao section of the Xuxi Provincial Road, Shengning Provincial Road, the Ninghai section of the Chengsong County Road, the Ninghai section of the Feida County Road, Meicha County Road and Shangjie County Road.
"The Hangzhou Bay Bridge and other sections of the freeways have been gradually closed since the evening of February 7. Today, the freeways in Ningbo are accessible, with some sections directed by traffic police and the Road Administration Bureau, and some sections closed to coaches." According to one official from Ningbo Road Administration Bureau, the opening time of the freeways depends on the weather condition, and people may choose others ways for travel if necessary.
It is expected that with the opening of the entries, the flow of vehicles will be at a high level. The related departments warn people to travel in order, to control the driving speed and keep the safe spaces between vehicles. The most important is that people should follow the directions of the road administration departments and the traffic police.
During the free-access period, no cards will be necessary at the toll gates. All the vehicles should slow down when going across the toll gates with a speed of about 20 kilometers per hour.
- Details
- Category: Ningbo News
All traffic nodes in urban areas got through
On the morning of October 13, the western elevated bridge at Tongtu Road reopened to traffic. With this, all traffic nodes in urban areas in Ningbo have got through.
The western elevated bridge on Tongtu Road was the most severely flooded place in the urban area of Ningbo, with the accumulated water amounting to about 120,000 cubic meters. With the day and night hard work of the city management department, the fire department of Ningbo and the firemen from Nantong and Wuxi of Jiangxi province, the accumulated water at the overpass was drained out early in October 13. With this, after the continuous intensive drainage, the water at all the overpasses in down town Ningbo was drained out.
By 13, the flood at 177 of the flooded living quarters receded. There is still some waterlogging in the basement of two living quarters in Haishu District and the drainage is going on.
When the accumulated water at the urban roads recede, the city management department is taking immediate action to clean the roads and streets in the urban areas.
At present, in the urban area, supply of water, gas, heat and telecommunication is all resumed. On October 13, the city management department repaired over 390 pot holes on the roads and all the street lighting has basically restored.
- Details
- Category: Ningbo News
Page 1013 of 1699