Home
A non-profit school of fine arts opened in Ningbo
On the afternoon of April 18, a non-profitable school of fine arts jointly run by the "117" Artistic Center of Ningbo Municipal Cultural Center and Zhongshan Park opened in Xiashui Kindergarten in Dongqian Lake.
This school is a project of Ningbo Municipal Cultural Center, aiming to be a platform for the children fond of painting. The school is funded on the sales of the works of children in contest of paintings.
- Details
- Category: Ningbo News
A noticeable drop of fireworks in Ningbo
In the first four days of the Spring Festival Holiday, the fireworks playing dropped sharply compared to last year. According to the Municipal Environmental Protection Bureau, the whole city is encouraged to stop playing fireworks so as to protect the environment. As a result, few people choose to play fireworks on Lunar New Year Eve and the total garbage was only 2000 tons, dropping about 1/3, which helps reducing the working time of the cleaners.
According to Mr. Hu, who is living in Huaqiaocheng, he was almost sleepless the whole night on the Lunar New Year Eve because of the thundering noise of fireworks. However, this year, when the new year bell sounds, the noise of fireworks only lasted for about 10 minutes. He was able to fall asleep this year now.
There is another evidence for the decline of fireworks in 2015. Mr. Shi has been selling fireworks in Yinzhou District for about 10 years. He said that the sales of fireworks is on the decline these years. In 2015, he only prepared half of the fireworks of last year. However, until the evening of Lunar New Year Eve, there were still many left. He had no choice but sell them at a low price. But there were still some unsold. For the next Spring Festival, he will prepare less or even stop the business.
The head of purchase and wholesale of a fireworks company said, there were 50 stores in 2014 in Haishu District. The number declined to no more than 20 in 2015.
- Details
- Category: Ningbo News
A Party for the Mid-Autumn Festival

Recently, a community in Jiangdong District organized a party for the coming Mid-Autumn Festival
- Details
- Category: Ningbo News
A Rail Transit Line 1 tunnel through
▲ line look Chunqiao station laying site
.
Source 2012-6-21 9:01:17 Ningbo Evening News
According to the duration of the arrangements, the public take the subway to the 2014
Early this morning, from Rail Transit Line 3 the subject workers, the Drum Tower Station - East entrance (Tianyi Square) station interval will be a long 25 meters wide and 22 m floor pouring is completed. Backplane pouring after this means that the full realization of a Rail Transit Line 1 "hole through" hope Chunqiao Station to Station East Ring Road South, all get through these underground stations and the interval between.
Construction of rail transit, you need to go through three landmark nodes, respectively, is the hole through the rail pass and Dentsu. The "hole through the" laying for the next step after another into the construction of mechanical and electrical installation laid the foundation.
Two years ago, the first tunnel boring machine began to promote
Rail Transit Line 1 of a project starting point for the urban area west of Gaoqiao Town, the end station for the East Ring Road South. The underground section of about 21 km long and 15 underground stations (14 underground interval between the station and the station from the Wang Chunqiao station to the East Ring Road South Station). Get through these intervals, there are two ways, one shield, the second is the open-cut. Range of 14 Drum Tower Station - East entrance (Tianyi Square) station interval is open-cut.
August 20, 2010, the first shield machine from Fuming Road Station to Century Avenue Station excavation, began the construction of rail transit shield. June 11, 2012, the West door - Gulou range the right lane tunnel through, on the 1st line of a line of shield range all through the shield construction has ended. 2-year period, a total of 11 tunnel boring machine to participate.
Open excavation of the underground range is 450 meters long, 22 meters wide, west to the rail transportation Drum Tower Station, east to Tianyi Square near Gate 1, a total of three layers: the bottom layer is the platform layer, to take the railway train; underground The second floor is the layer of station hall for ticketing and commercial development; the basement of the business district, with entrances and exits.
Shield and open-cut has gone through numerous risk
- Details
- Category: Ningbo News
Page 1007 of 1699