Home
Overall construction of Rail Transit No.4 starts
With the booming noise of the tunnel boring machine at the Lijiang Road Station of the Rail Transit No.4 on April 23, the section of the line between the Zhuangqiao Station to the Lijiang Road Station was completed smoothly. The completion of this first TBM section of the Rail Transit No.4 represents the successful resolution of the biggest risk spot of the line.
So far, the construction of all the 25 stations of the lien has been started, with that of the Dongqian Lake section and three other TBM sections well under way.
The TBM section between the Zhuangqiao Station to the Lijiang Road Station is 1208.1 meters long on its right line and 1342.3 meters on its left line. With such risk sources as the Xiaoshan-Ningbo Railroad, the Hangzhou-Shenzhen High-speed Railroad, the Baisha Branch of the railroad and ground source heat pumps, this section regarded as the part of the line with highest concentration of security risks. Reportedly, the Zhuangqiao Station of the railroad above the line receives 264 trains each day, posing great difficulty to the construction process.
- Details
- Category: Ningbo News
Bus fee payable by mobile phones
News came from the Ningbo branch of China UnionPay that from April 26 on, the "quick-pass payment with mobile phones" will be available on the 2576 buses of the 228 public traffic lines in the urban area. That is, when taking a bus, the citizens can pay the fee very conveniently with their mobile phones or their Unionpay cards with quick-pass service.
Reportedly, any mobile phone with the quick-pass function or any UnionPay card with the "quick pass" sign can be used to pay the fee when pressed to the induction area of the POS device on the buses.
- Details
- Category: Ningbo News
Genealogy enquiry available at Tianyi Pavilion Musuem
![]() |
Since April 7, with its rich holdings, the Tianyi Pavilion Museum has started the services for genealogy enquiry for the citizens.
- Details
- Category: Ningbo News
Ground-breaking ceremony of Ningbo Central Building held

The ground-breaking ceremony of Ningbo Central Building, with a designed height of 409 meters, was held at the construction site on the morning of April 9. Upon completion, it will become the tallest building in Zhejiang Province
- Details
- Category: Ningbo News
Page 691 of 1699
